Conference & Exhibition

Countermeasures for Technical Problems Occur During Operation of High CFRDs

E-mail Print PDF

Importance: Cracks and ruptures at face slabs had appeared in several high CFRDs in the two decades before 2007.Some were with high leakages (> 1,000 liter/s) such as in Barra Grande (185m, Brazil) and Campos Novos (202 m, Brazil) both in 2005 , Mohale (145m, Lesotho) in 2006, Tianshengqiao 1 (178m, China) during reservoir impounding in 2003 and 2005, that means after 3 and 5 years of operation and Aguamilpa (187m, Mexico) and so on.

Treatment on Cracks at Face Slab

E-mail Print PDF

Importance: How to treat the cracks at face slabs?
It is a common concern.
We introduce the measures to treat the cracks at china CFRD which are the practical experiences. 

HydrOu Three Gorges Tour

E-mail Print PDF

21.  1- day Three Gorges Hydropwer Station technical study tour
      Visit Three Gorges Hydropower plant
2. 3- day Three Gorges technical study tour 
    Panorama of Gezhoiba Hydropower Station      
    Full view of Three Gorges Dam
    Visit Three Gorges Dam   
    Memorial Park for Three Gorges closure

Invest for winning much more profit in China

E-mail Print PDF

img_in

Invest for winning much more profit in China
1. Present status of foreign investment in China  

In the first quarter, 2011, China actually used foreign investment of $30.34 billion, an increase of 29.4% compared to the same period a year earlier. Among them, the actual use of foreign capital in March is 12.52 billion US dollars, increased by 32.9% compared to the same period a year earlier.
China's foreign investment profit margins have been  20% or so, a very profitable for investors. 

Key Technologies for CFRD Construction in China

E-mail Print PDF

Key-Technologies-CFRD-Construction-in-China

Editor's note: This technical book focuses on the design and construction of CFRD in China taking the Shuibuya CFRD of 233m in height as example. It summarizes the all-round experiences of the design, construction, supervision and construction management of CFRDs with all drawings and data in details. It is good reference and value technical manuals for dam builders.

4th Optimization of High CFRD Construction

E-mail Print PDF

visiting_3gorges.JPG11May. 15-18, 2012, Yichang Three Gorges, China
4 Optimization of High CFRD Construction
Intention:Shorten the construction period, reduce the project investment, get an excellent reassured project for your people.

 

Workshop on Role of dam in flood control and drought fighting

E-mail Print PDF

1234

Main topics: crest forecast,flood reduction and control with dam, shiplock safety, conservation of soil and water, making full advantage of dam function for controlling  natural disasters

Seminar on Operation and Maintenance of CFRDs

E-mail Print PDF

DSCF00012

Focus on good operation of Shuibuya CFRD;
Main topics:
dam safety appraisal, safety evaluation, water quality under dam foundation, Safety surveying calculation, Ecological effects of dam, safety monitoring, flood protection, safety prowarning system for reservoirs, dangerous reservoir treatment, sick dam treatment