Importance: Cracks and ruptures at face slabs had appeared in several high CFRDs in the two decades before 2007.Some were with high leakages (> 1,000 liter/s) such as in Barra Grande (185m, Brazil) and Campos Novos (202 m, Brazil) both in 2005 , Mohale (145m, Lesotho) in 2006, Tianshengqiao 1 (178m, China) during reservoir impounding in 2003 and 2005, that means after 3 and 5 years of operation and Aguamilpa (187m, Mexico) and so on.
Workshop
Workshop on Role of dam in flood control and drought fighting

Main topics: crest forecast,flood reduction and control with dam, shiplock safety, conservation of soil and water, making full advantage of dam function for controlling natural disasters
Seminar on Operation and Maintenance of CFRDs

Focus on good operation of Shuibuya CFRD;
Main topics:
dam safety appraisal, safety evaluation, water quality under dam foundation, Safety surveying calculation, Ecological effects of dam, safety monitoring, flood protection, safety prowarning system for reservoirs, dangerous reservoir treatment, sick dam treatment

Workshop







Intention:Shorten the construction period, reduce the projec...
Focus on good operation of Shuibuya CFRD;Main topics:dam s...
Editor's note: This technical book focuses ...
Main topics: crest forecast,flood reduction and control wi...
Invest for winning much more profit in China1. P...





